I am getting really frustrated with the placement of our new kitchen.
Most cabinets are installed, but one cabinet is missing, the fridge isn't built in the way it should, I can't get the granite installed because of the missing cabinet and because of the granite missing, we can nt install the sink nor cooktop. Then the exhaust has a dent and needs replacement.
If the kitchen designer/salesteam would cooperate it wouldn't be so bad, but we are having some issues with them regarding the fridge not fitting.
Summary:
Tue Sept 4th:
The kitchen should have been installed on this day, but because of delays in the German factory, the installation is delayed till Sept 17th.
Mon Sept 17:
Kitchen installers (2) arrive but after putting all the cabinets in the kitchen, one of them gets really sick and needs to go to the doctor. They both leave for the day.
Tue Sept 18:
The same two guys arrive (one of them obvisouly still very sick - stomach flu) and install all the cabinets. After they are done it is very obvious that the "built-in" fridge isn't really built-in. It is sticking out more than an inch and as such you see the black side of the fridge, instead of just the inox door. The installers call the kitchen company (Thys) but they claim it is our problem because we didn't buy our fridge through them.
Wed Sept 19 - now:
Chris Bond (the builder and our contractor) is working with Thys to resolve the problem.
Wed Sept 19:
Kitchen is being measured for the granite.
Thurs Sept 20:
Check out Granite in store to verify whether we want to stay with the original design (which we do).
Wed Sept 26:
Granite guys can deliver and place the granite in the kitchen, but because of the missing cabinet they have to wait.
Thurs Sept 27:
Missing cabinet should have arrived today but is not there - this means another week without cabinet (they only deliver on Thursdays).